Uganda 30TPH Alluvial Tin Processing Plant

The combination of gravity separation and magnetic separation can perfectly purify tin ore.

Location

Uganda, Africa

Capacity

30TPH

Solutions & Process

Rock Tin Mining Plant

01

The raw ore is fed into the raw ore bucket above the vibrating feeder by excavators, loaders, etc. The vibrating feeder is equipped with a grid with a gap of 70mm; the ore larger than 70mm can be evenly fed into the trommel scrubber.

02

The ore smaller than 70mm enters the trommel scrubber for washing (the trommel washer is equipped with two layers of screens with apertures of 7mm and 25mm respectively). After washing, three types of ores can be obtained: 0-7mm, 7-25mm, and +25mm.

03

After washing in the trommel scrubber, the ore larger than 25mm is sent to the ore pile by a belt conveyor. The 7-25mm ore enters a group of roughing jig separators for roughing; the concentrate enters a group of fine jigs for further separating. 0-7mm enters another roughing jig concentrator for enrichment. Then, the concentrate will also enter a cleaner jig concentrator for further separation. The tailings of the roughing jig concentrator will enter a scavenging jig for further concentration. These circled loop jig separators here can improve the recovery rate.

04

Since there is a lot of water flowing out with the concentrate, all the concentrate from the jig separators will first enter the dewatering screen for dewatering. After dewatering, the particles on the screen will enter the hammer crusher through a belt conveyor. The undersize will be pumped to the mixing tank by a mud pump. The output of the hammer crusher will flow into the same mixing tank by gravity flow.

05

The shaking table further separates to obtain a purer tin concentrate. The output concentrate needs to be directly dried, and then the dry concentrate can be put into 3 disc dry magnetic separators for refining to obtain high-purity tin concentrate.

06

The tailings from these jig separators and the tailings from the shaking table will first enter the spiral dewatering machine for dewatering, and then enter the high-frequency vibrating screen for screening. Finally, two products of tailings coarse sand and fine sand are obtained.

Solutions & Process

Flowsheet of 30TPH Alluvial Tin Processing Plant0158

Wonderful! Share this Post:

Explore Our Projects

search Products

JXSC LOGO dark

Speak to Our Experts Today

Contact Us